6.9 KiB
FigCraft roadmap: milestones and what's next
Last reviewed: 2026-10-10 · Last updated: 2026-10-10 · Change: minor (merged #101–#103: plugins and the multiplayer core) · Target: Figma Design (desktop app 126.10.7)
Forward-looking plan. Where FigCraft stands today: ROADMAP.md and
target-app-parity.md; the full ranked list: gaps.md. Hours
are one Opus 5.5 agent; most milestones split across 4–6 agents on disjoint crates. There is no
cargo xtask scorecard in this repo; the measured number is cargo xtask parity.
Current focus
.figimport (best effort) with a synthetic.figcorpus saved from the installed Figma: 30–60 h. Unblocks beta and every real-file measurement.- Real-file corpus and fidelity measurement: import real files, compare against Figma's own exports, turn estimated percentages into measured ones: 15–30 h.
- Tool-by-tool interaction pass against the running Figma (
ui-parity.md): 40–60 h, parallel by tool. - Localization layer, then Figma's own languages first (ja, ko, es, pt-BR, fr, de): 15–25 h for the layer, 3–5 h per language plus native review.
- Multiplayer M9: the browser client, a standalone server and sharing on top of the live sessions (the WebSocket transport, hosting from the app, invite links, document sync, live cursors, selections, avatars and follow, per-user undo and reconnect with offline edits landed), per
collab-protocol.md: 45–90 h.
Alpha gate
The core workflows a Figma Design user runs every day, checked end to end on macOS (the main
platform) with work saved to .figcraft and reopened. Evidence is the repo's tests and the
builders' side-by-side checks with synthetic files; nothing has been run on real Figma files yet.
| Workflow | Works end to end? | Evidence | Hours to pass |
|---|---|---|---|
| Design screens: frames, shapes, vectors, text, auto layout, styles; save, reopen, export assets | yes | tools and panels in crates/engine and crates/ui-egui; .figcraft round trips (crates/format/src/large_tests.rs); PNG/JPG/SVG/PDF export tests |
— |
| Build and use a design system: components, variants, properties, variables and modes, libraries | yes | components_scale_tests.rs (300 components, 2,000 instances), library_tests.rs, library_variables_tests.rs; libraries are local files, not shared |
— |
| Prototype and present: interactions, flows, overlays, smart animate, variables | yes | proto_*_tests.rs, present_*_tests.rs |
— |
| Hand off to developers: Dev Mode inspect, code, measurements, asset export, ready for dev | yes | devinspect_tests.rs, component_codegen_tests.rs, devcompare_tests.rs, annotations_tests.rs |
— |
| Review with others: comments, versions, sharing the work | partial (not blocking) | comments with threads, mentions and resolve plus version history work inside a file (comments_tests.rs, version_tests.rs); the file is shared by passing it along; no real-time co-editing or share links yet; the sync core landed without networking (collaboration-parity) |
beta gap: 45–90 |
Continue existing Figma work (open .fig) |
no (beta gap) | no .fig reader; REST JSON import works for files fetched through Figma's API (file-format-parity) |
beta gap: 30–60 |
Passes, so FigCraft stays alpha: every daily design workflow works end to end on FigCraft's
own files, which save and reopen, and ready for real work (~47%) is above the ~40% bar. The two
gaps are real but don't break a workflow done in FigCraft: review works asynchronously through
comments in a shared file, and opening .fig is the step that moves work across from Figma, which
the standard requires for beta, not alpha. Both stay at the top of gaps.md as beta
blockers.
Milestones
| Milestone | Status | Left | Hours |
|---|---|---|---|
| M0 Foundation: workspace, model, renderer, engine, UI shell, app, control channel | done (2026-10-09) | — | — |
| M0.9 CLI + MCP, web build, release packaging, PDF export | done (v0.2.0 released 2026-10-10 for every platform) | — | — |
| M1 Core editing completeness (tools, panels, menus, clipboard, files) | ~75% | Open recent, outline mode variants, keyboard box selection, interaction pass | 8–14 + pass |
| M2 Layout depth | ~80% | grid fr rows, real-file QA |
6–12 |
| M3 Components & styles depth | ~75% | extended collections, variables import/export, real libraries | 10–20 |
| M4 Vector & text depth | ~70% | live booleans, spell check, Figma Draw (brushes, pressure, text on a path, patterns) | 24–40 |
| M5 Prototype & present | ~85% | media, gamepad, separate window | 5–9 |
| M6 Interop & Dev Mode | ~55% | .fig import, video/HEIC/TIFF, CMYK intent, Code Connect |
40–80 |
| M7 Release & fidelity (signed builds, look & feel, shortcuts) | builds done; fidelity pass started | tool-by-tool pass | 40–60 |
| M8 Hardening & performance (bench, retained canvas, accessibility, idle) | ~60% | real-file corpus, platform QA, GPU canvas, screen readers | 60–110 |
| M9 Real-time collaboration | core done (#103: ids, change sets, server ordering, convergence); live sessions (WebSocket transport with limits and reconnect, hosting from the app, invite links, document sync between apps, cursors, selections, avatars, follow, collab.* commands); per-user undo, rejection handling, offline queue and resuming after a reconnect |
figcraft:// link handler, browser client, standalone server, sharing |
45–90 |
| M10 Localization (new) | not started | layer + 11 languages | 60–100 |
| M11 Plugins | runtime, API, menu, manager and SDK done (#101) | run-time plugin UI, settings storage, distribution, widgets; Figma plugin compatibility is an owner decision | 25–55 |
| M12 AI features (new, owner decision) | not started | local models | 30–60 |
Next, after the current focus
- Shared libraries on top of the multiplayer server (10–20 h), branching (8–15 h).
- GPU canvas held to the CPU renderer (30–60 h).
- Figma Draw tools (10–18 h).
- Mobile viewer and prototype mirror (20–40 h).
Revision history
| Date | Change | Summary |
|---|---|---|
| 2026-10-10 | minor | Merged main after #101–#103: WASM plugins (plugins area 0% → 35% breadth, 20% ready; ecosystem 5% → 20%) and the multiplayer core without networking (multiplayer 5% → 15% breadth, 5% ready; collaboration 8% → 12%); menu breadth 97.5% → 98.5% (200/203); ready for real work ~46% → ~47%; full parity 420–790 h → 390–745 h; beta 210–380 h → 200–365 h. Fixed the stated weight sums (areas 1–16 sum to 94, total 113; percentages were already computed with those) |
| 2026-10-10 | minor | Added the alpha gate (core-workflow table): passes, stage stays alpha |
| 2026-10-10 | major | Created: milestone table moved from ROADMAP.md with statuses re-checked; added M10–M12; current focus re-planned |